Subject: | Reports footer notes hyperlink is incorrect |
Summary: | The hyperlink in all report footer notes should be: https://www.linktechnologies.com.au This change is required in 270 reports in the system. |
Audit Notes: | Edited by alvis on 13/04/21 11:39. Edited by alvis on 12/04/21 14:48. Edited by alvis on 12/04/21 14:47. Edited by alvis on 25/02/21 10:45. Edited by alvis on 25/02/21 10:37. Edited by alvis on 25/02/21 10:35. |
25 Feb 2021 | 10:14AM Comment 1 by Sanjay (Link Technologies) Case L12171 added to project 12.4 |
25 Feb 2021 | 10:35AM Comment 2 by Alvis (Link Technologies) ETC was changed from 17/02/2021 to 17/02/2021 |
25 Feb 2021 | 10:37AM Comment 3 by Alvis (Link Technologies) ETC was changed from 17/02/2021 to 19/03/2021 |
13 Apr 2021 | 11:39AM Comment 4 by Alvis (Link Technologies) ETC was changed from 19/03/2021 to 30/04/2021 |
23 Apr 2021 | 02:48PM Comment 5 by Alvis (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 28-04-2021 04:47 PM |
| Redirect "http://www.linktechnologies.com.au/" to "https://www.linktechnologies.com.au/" |
|
23 Apr 2021 | 03:39PM Comment 6 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 28-04-2021 05:38 PM Time Taken: 2.00 |
| Added a redirect on the unsecured "linktechnlogies.com.au" to redirect to secured linktechnologies.com.au |
|
26 Apr 2021 | 09:47AM Comment 7 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 28-04-2021 11:46 AM Time Taken: 0.50 |
| QA Results Tests carried out according to requirements specified on the case header Test Results Summary Table 1 - Summarised list of issues No | Test Description | Pass/Fail | 1 | Click on the report footer hyperlink and this take the user to the "Link Technologies" website. | Pass |
Environment Details - OS version: Windows Server 2012
- Application version: 12.40.0426RC1
- Setup: Demo
- Server : 10.0.0.14
- Database: LINKSOFT-DEMO-124
Next Step: - For Closure
|
|
26 Apr 2021 | 01:47PM Comment 8 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 28-04-2021 03:47 PM |
| Thanks Rashna |
|